
Price:
Price 355 INR / Bag
Minimum Order Quantity : 1 Bag
Physical State : Powder
Other Names : SILVER STAR
Usage : Construction
Application : *Sufficiently flat to permit the specified flatness of finished tiling, bearing in mind the permissible thickness of the adhesive. * Suitable for tiling in the service conditions to which it will be exposed. * Surfaces to be tiled must be dry, clean and free from loose material and contamination.
Price 433 INR / Bag
Minimum Order Quantity : 1 Bag
Physical State : Powder
Other Names : Tile Adhesive
Usage : Construction, Other
Application : 1. Spread not more than the area which can be tiled within the open time of the adhesive. 2. Comb the adhesive to the required depth using a suitable square notch trowel. 3. Press the tiles firmly into position with a slight twisting action, checking periodically that good contact is maintained with the back of each tile. Leave no voids behind tiles. 4. Tiles should be fixed within 20 minutes of adhesive being applied, depending on the porosity of the surface and atmospheric conditions. Tiles can be adjusted up to 15 20 minutes after fixing. Touch the adhesive ribs periodically and if a skin has formed, remove the adhesive and apply a new layer. 5. Leave adequate joints between individual wall and floor tiles unless self spacing tiles are used. 6. Clean off surplus adhesive from the tile face and between joints.
Price 1050 INR / Bag
Minimum Order Quantity : 1 Bag
Physical State : Powder
Other Names : HEAVY DUTY IMPREGNATING TILE & STONE SEALER
Usage : Construction
Application : 1 Test the Sealer initially on a small inconspicuous area. 2 Ensure the surface is clean. Use suitable cleaner to remove any cementitious deposits. 3 Following cleaning, thoroughly rinse with clean water and allow the area to completely dry out for approx. 3 days. 4 Apply HEAVY DUTY IMPREGNATING TILE & STONE SEALER to the surface using a soft bristle brush or a fluff free cloth and leave it to soak for approx. 5 minutes. Wipe off any surplus sealer remaining on the surface. 5 Two or more coats as necessary depending on the porosity. Allow 2 hours of drying time between coats. 6 The floor can be trafficked 24 hours after the final coat depending on the condition
Price 520 INR / Bag
Minimum Order Quantity : 1 Bag
Physical State : Powder
Other Names : GOLD STAR
Usage : Packing